Baseline Definition and Benchmark Scope
Southeast Asian PP stackable-crate molds are multi-cavity stack molds with floating center sections, air ejection, and cam-operated actuators for agricultural containers. PP material specifications: melt temperature 220β280Β°C, shrinkage 1.5β2.0%, density 0.90 g/cmΒ³, flexural modulus 1.1β1.6 GPa. Typical wall thickness 1.5β4 mm supports stacking loads without UV degradation risk (requires stabilizer additives). Benchmark scope covers mold steel grade (P20/NAK80), cavity count (4β8 cavities), cycle time 45β75 seconds, and modular center-section repeatability. Regional benchmarks exclude custom automation or proprietary stack mechanisms; focus is on standard floating-center designs with suction-cup ejection into side chutes.