Baseline Definition and Benchmark Scope
PP outdoor crate molds in Southeast Asia target wall thicknesses of 1.5β3.5 mm to balance structural rigidity with cycle efficiency. Baseline scope covers injection-molded polypropylene (density 0.90 g/cmΒ³) with mold cavity counts of 2β8, gate designs optimized for uniform shrinkage control (1.5β2.0%), and outdoor chemical resistance without UV stabilizer additives. Mold steel is typically P20 or hardened aluminum for lower-volume runs. Benchmark includes lead-time from design freeze to first article, tooling cost allocation, cavity-to-cavity dimensional variance (Β±0.1β0.3 mm), and cycle-time consistency across 100,000+ part runs. Regional scope excludes custom surface texturing and post-mold assembly; focuses on injection and gate removal only.