Baseline Definition and Benchmark Scope
This benchmark covers injection-molded PP outdoor food-beverage crates produced in Latin America, targeting wall thicknesses of 2.0β3.5 mm with UV-stabilized PP (0.90 g/cmΒ³ density). Mold cavity counts range from 2 to 8 cavities. Baseline assumes medium-volume production (50,000β200,000 units annually), standard draft angles of 1.5β2.5Β°, and gate locations optimized for uniform cooling. PP's flexural modulus of 1.1β1.6 GPa supports structural rigidity for stacking loads typical of crate applications. Shrinkage compensation targets 1.5β2.0% to maintain dimensional tolerances. Benchmark excludes custom color matching, insert molding, and secondary assembly; covers material, molding labor, and mold amortization only.