Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and multi-cavity PP chair molds (2β4 cavities) for logistics seating applications in North America. PP density 0.90 g/cmΒ³ and shrinkage 1.5β2.0% define dimensional stability requirements. Typical chair mold wall thickness ranges 1.5β3.5 mm to balance structural rigidity with cycle-time efficiency. Baseline assumes 40β80 g part weight, $0.95β$1.15 per kg PP resin cost, and mold steel (P20/NAK80) with 500,000β1,000,000 shot life. Regional scope includes US, Canada, and Mexico facilities. Benchmark excludes post-molding operations, secondary finishing, and custom UV stabilizer premiums. Reference cycle time baseline: 10β12 seconds for standard chair seat/back components.