Baseline Definition and Benchmark Scope
PC checkout basket molds in North America are benchmarked on molds producing 20β50-liter capacity baskets with wall thicknesses of 1.5β3.0 mm, typical of retail logistics applications requiring optical clarity and impact resistance. PC's processing window (melt temperature 280β320Β°C, shrinkage 0.5β0.7%) and flexural modulus of 2.3 GPa define structural performance for load-bearing basket handles and walls. Baseline scope covers tool steel cavity/core construction, single-cavity or 2-cavity layouts, and standard cooling circuits. Clamp tonnage typically ranges 150β250 metric tons depending on projected area and gate design. Benchmark includes cavity pressure monitoring, gate design optimization, and operator skill requirements specific to PC's sensitivity to thermal cycling and moisture absorption. This scope excludes hot-runner systems or advanced conformal cooling, which represent cost-add scenarios requiring separate analysis.