Baseline Definition and Benchmark Scope
PC cold-chain crate molds are single-cavity or multi-cavity tools designed for 1.5β4 mm wall sections, optimizing PC's 2.3 GPa flexural modulus for structural rigidity under stacking loads. Baseline scope covers mold steel construction with spiral cooling channels positioned near sprue sections to manage PC's melt temperature window (280β320Β°C). Crate geometry demands uniform gate placement to minimize shrinkage variance (0.5β0.7%) and optical distortion. Benchmark includes cavity count (1β8), cooling-circuit complexity, and ejector-pin arrays. Regional Middle East scope excludes custom inserts or secondary operations; focuses on tool-ready molds meeting ISO 1043-2 PC material specifications and ASTM D3618 dimensional tolerance bands.