Baseline Definition and Benchmark Scope
This benchmark covers PC injection molds for cold-chain crates in Southeast Asia, targeting wall thicknesses of 1.5β4 mm with melt temperatures 280β320Β°C. PC's optical clarity and high-impact strength suit logistics applications, but poor solvent resistance requires careful material handling and gate design. Baseline scope includes mold cavity count (typically 2β8), cooling-circuit complexity for thermal uniformity, and shrinkage compensation of 0.5β0.7%. Benchmark data reflects standard production volumes (50kβ500k cycles annually), regional labor costs, and lead-time variability across Vietnam, Thailand, and Indonesia. Quality KPIs include dimensional tolerance (Β±0.05β0.10 mm), surface finish (Ra 0.8β1.6 Β΅m), and warpage control critical for stackable crate geometry.