Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and multi-cavity PP outdoor crate molds (10β50 L capacity) produced for North American logistics OEMs. PP material specifications: melt temperature 220β280Β°C, shrinkage 1.5β2.0%, wall thickness 1.5β4 mm, flexural modulus 1.1β1.6 GPa. Outdoor designation requires UV-stabilizer compounding, increasing material cost 3β8% and adding 2β4 seconds to cycle time versus unfilled PP. Mold scope includes center hot-tip gating, stripper-plate ejection with pneumatic actuation, and standard cavity surface finish (Ra 1.6β3.2 Β΅m). Benchmark excludes secondary operations (painting, pad printing) and chrome plating, quoted separately. Lead-time baseline applies to molds ordered by North American injection molders with standard tool steel (P20) and delivery to U.S./Canadian facilities.