Baseline Definition and Benchmark Scope
HDPE stackable-crate molds in North America are single or dual-cavity stack designs with wall thicknesses of 2.5–4.5 mm, optimized for material flow at HDPE processing temperatures of 180–230°C. Stack molds require 15–20% higher clamp forces than single-level cavities due to multi-level or dual-parting-line cavity arrangements. Benchmark scope covers molds producing crates with stacking ribs, drainage features, and reinforced corners—typical structural requirements for logistics applications. HDPE's superior impact resistance at low temperatures and excellent chemical resistance justify its selection over PP for cold-chain and outdoor storage environments. Baseline includes mold steel grade (P20 or H13), cavity count (1–2), and estimated shot weight of 800–2,500 grams per cycle.