Baseline Definition and Benchmark Scope
PC stackable-crate molds for North American logistics are defined as multi-cavity, stack-mold configurations with modular center-section construction and air-ejection or cam-actuated removal systems. Baseline specifications include wall thickness 2.0–3.5 mm, cavity count 4–16 per stack level, and cooling-line design accommodating PC's thermal sensitivity. PC material constraints—melt temperature 280–320°C, shrinkage 0.5–0.7%, flexural modulus 2.3 GPa—directly impact mold steel selection (P20 hardened preferred) and cycle-time feasibility. Benchmark scope covers mold design, tooling lead-time, first-article inspection, and production ramp. Regional scope includes U.S. Midwest, Southeast, and Canadian facilities with ISO 13485 or equivalent quality systems.