Baseline Definition and Benchmark Scope
PE stackable-crate molds in Southeast Asia are defined by modular, multi-cavity construction (typically 8–16 cavities) with floating center sections and air-ejection systems. PE's density (0.94–0.97 g/cm³) and low stiffness require wall thickness 2–5 mm to maintain crate rigidity; melt temperature windows 180–230°C and shrinkage 2.0–3.0% directly impact cycle consistency. This benchmark covers tooling cost per cavity, injection cycle time (30–60 seconds typical), first-article quality gates, and regional lead-time norms (10–14 weeks for standard molds). PE's chemical resistance suits logistics but demands tight shrinkage control to prevent dimensional drift across stacking loads.