Baseline Definition and Benchmark Scope
This benchmark covers injection molds for outdoor retail baskets manufactured in HDPE (0.94β0.97 g/cmΒ³ density). Typical wall thickness ranges 2β5 mm; structural ribs and draft angles accommodate HDPE's 2.0β3.0% shrinkage. Mold cavity count: 2β8 cavities. Baseline assumes standard cooling circuits, torpedo gates on A-cavity plates, and externally heated hot-runner manifolds with H-H configuration for streamlined flow paths. Scope includes mold design, fabrication, commissioning, and first-article inspection across US, Canada, and Mexico manufacturing zones. Excludes secondary finishing, assembly fixtures, and customer-specific automation.