Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and multi-cavity PC outdoor basket molds (1.5β4 mm wall thickness) produced in Southeast Asia. PC's 1.20 g/cmΒ³ density and 2.3 GPa flexural modulus suit structural outdoor applications; however, poor solvent resistance requires UV-stabilized grades. Baseline scope includes mold base costs ($28,100β$42,500 USD), cavity customization ($5,250β$8,000 per cavity), and regional lead-time variance (12β18 weeks). Quality thresholds: dimensional tolerance Β±0.05 mm, surface finish Ra 0.8β1.6 Β΅m, and zero flash/sink defects. Cycle-time baseline: 45β70 seconds at 280β320Β°C melt temperature, depending on cavity count and wall geometry. Shrinkage allowance 0.5β0.7% is non-negotiable for PC optical clarity in retail baskets.