Baseline Definition and Benchmark Scope
ABS cold-chain crate molds in Southeast Asia are defined by cavity count (4–16 cavities), wall thickness of 1.5–3.0 mm for structural rigidity, and part weight typically 200–800 g. ABS shrinkage of 0.4–0.7% demands precision cooling channels to maintain dimensional consistency across stackable crate geometries. Baseline molds support 500,000–2,000,000 shot cycles. Processing temperature windows (220–260°C) and flexural modulus of 2.1–2.8 GPa ensure load-bearing performance in stacked cold-storage environments. This scope excludes multi-material or co-injection variants; covers single-material ABS cavity designs for thermoformed or injection-molded crate bodies.