Baseline Definition and Benchmark Scope
HDPE cold-chain crate molds for retail logistics require 2–5 mm wall thickness with dimensional stability across thermal cycling. Latin American baseline assumes virgin HDPE (MFI 0.3–2.0 g/10min), melt temperature 180–230°C, and cavity count 2–8. Shrinkage tolerance ±1.5% (±0.45 mm on 300 mm features) reflects HDPE's semicrystalline behavior and orientation sensitivity. Crate structural integrity demands flexural modulus 0.8–1.5 GPa, ensuring stack-load performance at –20°C (HDPE's superior low-temperature impact vs. PP). Scope covers single-cavity to 8-cavity progressive molds, cavity-pressure monitoring, and thermal cycling validation on sample parts.