Baseline Definition and Benchmark Scope
This benchmark covers PE injection molds for retail cold-chain crates manufactured by European toolmakers (Germany, Czech Republic, Italy). Baseline specifications: crate cavity volume 40β60 L, wall thickness 2.5β4.0 mm, gate location optimized for PE's high shrinkage sensitivity (2.0β3.0%). Mold material is P20 or H13 steel with hardened steel pinch-offs and aluminum cooling circuits for rapid thermal cycling. Cycle time baseline: 45β65 seconds (PE requires ~30 s stabilization vs. PS at 15 s). Cavity count: single to quad. Lead-time scope includes design approval, steel procurement, machining, cooling assembly, and trial runs. Quality KPI floor: Β±0.5 mm dimensional tolerance on crate walls, <2% first-shot scrap rate.