Baseline Definition and Benchmark Scope
PP cold-chain crate molds in Southeast Asia are defined by structural requirements matching ISO 3691-4 stacking and thermal shock resistance. PP processing windows (melt temp 220–280°C, shrinkage 1.5–2.0%) establish mold cooling and gate design constraints. Wall thickness typically ranges 1.5–4 mm; cold-chain crates standardize at 2.5–3.5 mm to balance impact resistance and cycle speed. Durability benchmarks cover 500,000–2,000,000 shot life before dimensional drift exceeds ±0.3 mm. Regional benchmarks account for Southeast Asian ambient humidity (60–90%), which accelerates mold corrosion without proper steel grade selection (P20 vs. NAK80). Baseline scope includes cavity count (4–16 cavities), ejection system wear, and cooling-line fouling—critical failure modes in high-humidity environments.