Baseline Definition and Benchmark Scope
HDPE nestable-basket molds for retail applications require 2–4 mm nominal wall thickness to balance stacking strength with material cost. Melt processing occurs at 180–230°C; mold cavity design must accommodate 2.0–3.0% shrinkage to ensure nest-lock geometry and dimensional repeatability across production runs. Density range 0.94–0.97 g/cm³ drives part weight predictability critical for logistics cost modeling. This benchmark covers single-cavity and multi-cavity tooling (2–4 cavities) typical in Latin American contract shops, with cycle times 25–45 seconds per shot. Scope includes mold steel grade (P20 standard), cooling-line design, gate positioning, and ejection-pin placement—all material-specific to HDPE's lower melt viscosity and thermal sensitivity.