Baseline Definition and Benchmark Scope
This benchmark applies to single-cavity and multi-cavity PP nestable-basket molds (typical volume 2–5 L per unit) for North American retail distribution. PP shrinkage baseline is 1.5–2.0%, with wall thickness ranging 1.5–3 mm to balance stiffness and cycle speed. Mold complexity includes interlocking ribs, draft angles (2–4°), and undercuts for nesting features. Baseline cavity count: 1–4 cavities. Injection pressure operates 80–120 MPa; mold temperature 50–70°C. Cycle time benchmark: 45–65 seconds (includes cooling, ejection, and part handling). Quality KPIs: dimensional tolerance ±0.3–0.5 mm, surface finish Ra 1.6–3.2 µm, and zero visible gate witness marks or sink marks on nesting surfaces.