Baseline Definition and Benchmark Scope
This benchmark covers PP nestable-basket molds produced in Southeast Asia, targeting retail stacking applications. Baseline specifications: wall thickness 2.0β3.5 mm, cavity count 2β4, mold steel H13/NAK80, PP melt temperature 220β260Β°C. Nestable designs require tight dimensional tolerance (Β±0.3 mm) on stacking surfaces and draft angles 1.5β2.5Β° to prevent interlocking. Shrinkage compensation 1.5β2.0% is critical; post-shrinkage can reach 2.5% without stabilizer additives. Cycle time baseline: 50β60 seconds (cooling-dominated). Benchmark scope excludes overmolded handles, texture inserts, and custom color-matching additives. Regional scope: Vietnam (primary), Thailand, Indonesia. Data reflects 2024 Q3βQ4 market conditions.