Baseline Definition and Benchmark Scope
This benchmark covers single and multi-cavity stackable-crate molds in HDPE for European retail logistics, targeting wall thicknesses of 2.5β4.5 mm and cavity counts of 2β8. HDPE's density range (0.94β0.97 g/cmΒ³) and flexural modulus (0.8β1.5 GPa) define structural performance for stacking loads. Baseline mold sizes range 400Γ300 mm to 600Γ400 mm per cavity. Scope includes tool steel (P20/1.2311 or H13), cooling-channel design, ejection systems (air or mechanical), and modular stack-mold configurations common in Central and Western Europe. Shrinkage compensation of 2.0β3.0% is mandatory; cycle-time targets are 25β45 seconds per shot at 180β220Β°C barrel temperature.