Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and 2Γ8 stack-mold configurations for PC retail stackable crates in North America. PC's optical clarity and high-impact strength suit retail visibility, but its poor solvent resistance and 1.20 g/cmΒ³ density require careful wall design (1.5β4 mm range) to balance stiffness and cycle efficiency. Baseline scope includes mold cost per cavity, machine-hour rates, material cost per shot, and regional lead times (8β14 weeks standard). Stack-mold configurations use modular center-section design with air ejection and cam-operated actuators, increasing complexity and tooling investment. Benchmark excludes secondary operations, assembly, and post-mold finishing. Reference data captures Q2βQ4 2024 North American supplier pricing and performance metrics.