Decision Context and Winning Criteria
Basket mold selection hinges on surface aesthetics, dimensional tolerance, and total landed cost. ABS excels in tight tolerance applications: 0.4β0.7% shrinkage enables Β±0.1 mm precision on basket ribs and interlocking features without secondary finishing. Its flexural modulus (2.1β2.8 GPa) maintains basket rigidity under stacked load without wall thickening. HDPE shrinks 1.5β2.5%, requiring larger mold compensation and post-mold trimming. Choose ABS when retail presentation and snap-fit assembly demand visual consistency; choose HDPE when chemical exposure (detergents, oils) and cost reduction override tolerance precision. Procurement must weight mold complexity (ABS requires tighter cavity control) against material cost differential and end-use environment.