Decision Context and Winning Criteria
Choose ABS for crate molds when dimensional precision and cost control dominate procurement priorities. ABS shrinkage of 0.4–0.7% enables wall tolerances of ±0.1 mm on 1.5–3 mm sections, critical for stackable crate nesting. ABS flexural modulus (2.1–2.8 GPa) provides adequate rigidity for stacked loads under 50 kg per unit. Select PC when impact absorption and temperature resistance outweigh cost: PC tolerates -40°C to 120°C continuous exposure versus ABS's -30°C to 80°C limit. Cost differential: ABS resin averages 20–30% lower than PC per kilogram. Crate applications with high-speed automated handling favor ABS; cold-chain and automotive logistics favor PC. Establish mold cooling time targets (ABS: 15–20 sec; PC: 25–35 sec) before supplier selection.