Decision Context and Winning Criteria
Choose ABS for retail baskets prioritizing dimensional stability and cost efficiency: ABS shrinks 0.4β0.7%, enabling tighter tolerances without secondary finishing. Its 2.1β2.8 GPa flexural modulus provides adequate stiffness for load-bearing walls (1.5β3 mm nominal). ABS processes at 220β260Β°C, reducing cycle time and energy costs versus PC. Choose PC when baskets face prolonged sunlight, thermal cycling, or require superior impact resistance at corners and handles. PC's lower shrinkage variability suits transparent or translucent designs. Decision rule: ABS wins on cost and precision; PC wins on durability and environmental resistance. For retail applications under 50Β°C ambient, ABS delivers 15β25% lower material cost while meeting structural demands.