Decision Context and Winning Criteria
Choose ABS when dimensional precision and rigidity are non-negotiable. ABS melt temperature 220–260°C enables tight tolerances (0.4–0.7% shrinkage) critical for nested stacking baskets with interlocking features. ABS flexural modulus 2.1–2.8 GPa provides structural integrity under load-bearing conditions. Choose PE when cost minimization and weight reduction dominate. PE's lower density (0.86–0.96 g/cm³) reduces material spend and shipping costs; however, PE shrinkage typically exceeds ABS, risking fit-tolerance failures in multi-part assemblies. For outdoor applications, evaluate UV exposure: ABS requires UV-stabilized grades; PE naturally resists weathering but lacks ABS's surface gloss options (high-gloss, ultra-high-gloss specialty grades). Procurement priority: if tolerance stack-up ≤±0.5 mm, mandate ABS; if weight/cost targets override precision, PE is viable only with relaxed dimensional windows.