Decision Context and Winning Criteria
Choose ABS when logistics baskets require dimensional consistency, stacking stability, and chemical resistance in warehouse environments. ABS melt temperature 220–260°C enables precise gate location and minimal shrinkage (0.4–0.7%), critical for nested basket designs. Choose PE when cost-per-unit and impact absorption dominate—PE tolerates wider processing windows and lower tooling stress. ABS wall thickness 1.5–3 mm maintains rigidity under load; PE requires thicker sections (2–4 mm) for equivalent stiffness. Procurement decision hinges on volume commitment: ABS justifies higher mold cost (tighter cooling channels) for SKUs exceeding 500K annual units; PE suits contract manufacturing and seasonal demand with lower capital investment and faster cycle times.