Decision Context and Winning Criteria
Choose ABS when dimensional precision and surface aesthetics drive value. ABS melt temperature 220β260Β°C enables tight tolerances (0.4β0.7% shrinkage) critical for nested retail baskets; flexural modulus 2.1β2.8 GPa resists deflection under stacked loads. ABS wall thickness 1.5β3 mm supports structural integrity in outdoor stacking scenarios. Choose PP when material cost and chemical resistance dominate. PP shrinks 1.0β1.5%, acceptable for loose-fit baskets, and resists moisture/UV better outdoors. Winning criteria: if aesthetic quality, dimensional consistency, and metal-plating capability matter, ABS wins. If cost-per-unit and chemical durability are primary, PP wins. Outdoor UV exposure slightly favors PP; tight nesting favors ABS.