Decision Context and Winning Criteria
Select ABS when retail crates require tight dimensional control, premium surface finish, and metal-plating capability for branded logistics applications. ABS's flexural modulus of 2.1–2.8 GPa and shrinkage of 0.4–0.7% enable close-tolerance stacking and consistent part geometry across production runs. Choose PP when chemical exposure (cleaning agents, oils, solvents) dominates the use environment and material cost is a primary lever. PP's superior chemical resistance and 15–20% lower resin cost offset its higher shrinkage (1.0–1.5%) and lower stiffness. For retail crates, the decision hinges on whether brand presentation and dimensional consistency (ABS) or chemical durability and cost reduction (PP) drives procurement value.