Decision Context and Winning Criteria
Choose HDPE when food baskets require impact resistance at cold-chain temperatures and chemical compatibility with detergents and oils. HDPE's flexural modulus of 0.8–1.5 GPa supports 2–5 mm wall designs with excellent dimensional stability (2.0–3.0% shrinkage). PC wins when optical clarity, higher stiffness (2.3–2.4 GPa), and temperature resistance above 130°C are mandatory. For stackable baskets in retail environments, HDPE's lower density (0.94–0.97 g/cm³) reduces shipping cost; PC justifies premium pricing only when transparency or load-bearing rigidity directly impacts product function or brand perception.