Decision Context and Winning Criteria
PC vs ABS selection for logistics crates hinges on functional and economic trade-offs. Choose PC when optical visibility of contents, high impact absorption, and wall thickness control (1.5–4 mm) are critical—its 2.3 GPa flexural modulus ensures load-bearing rigidity without brittleness. ABS wins when chemical resistance to fuels, oils, and cleaning agents is mandatory, or when cycle-time reduction and lower material cost justify sacrificing clarity. For stackable crates exposed to UV or thermal cycling above 100°C, PC's heat stability outperforms ABS. Conversely, if crates contact solvents or require aggressive washdown protocols, ABS's superior chemical resistance and lower processing temperature offset PC's impact advantages. Define acceptance criteria upfront: impact energy absorption, stacking load capacity, and chemical exposure scenarios.