Decision Context and Winning Criteria
Agriculture basket molds demand material selection balancing visibility, durability, and cost. PC's exceptional optical clarity and high impact strength suit applications requiring product inspection or branded transparency. Its flexural modulus of 2.3 GPa and wall thickness range of 1.5–4 mm provide structural rigidity for stacking loads. However, PC's poor solvent resistance and difficult flow characteristics (melt temperature 280–320°C) complicate processing. HDPE excels in cost efficiency and processability but sacrifices clarity and chemical resistance. Choose PC when outdoor baskets require UV resistance, impact durability, or customer-visible quality markers. Select HDPE when cost minimization and high-volume production throughput override transparency needs and chemical exposure risk is minimal.