Decision Context and Winning Criteria
Choose PC when crate design demands optical clarity, high impact resistance, or premium branding—typical wall thickness 1.5–4 mm enables thin-wall precision molding with tight dimensional tolerances. PE wins on total cost-of-ownership for opaque, high-volume utility crates where chemical resistance to oils, solvents, and detergents is critical. PC's melt temperature window (280–320°C) requires tighter thermal control and longer cycle times; PE processes faster at lower temperatures. For food-contact crates, PC's poor solvent resistance may require post-processing sealing or coating. Evaluate tooling complexity: PC's flow characteristics demand superior gate design and venting; PE's lower viscosity tolerates simpler cavity layouts. Define acceptance criteria around shrinkage tolerance (PC ±0.5–0.7%), surface finish, and impact performance at anticipated service temperatures.