Decision Context and Winning Criteria
PC vs PP selection for agriculture baskets hinges on end-use environment and cost tolerance. Choose PC when baskets require optical transparency, high-impact resistance in cold-chain or outdoor storage, and superior dimensional stability (0.5–0.7% shrinkage). PC's 2.3 GPa flexural modulus supports rigid sidewalls without reinforcement. Choose PP when cost minimization dominates and baskets tolerate lower clarity, since PP shrinks 1.0–1.5% and offers weaker impact performance. PC's poor solvent resistance limits applications exposed to pesticides or fertilizer chemicals; PP resists these better. Processing temperature difference is critical: PC requires 280–320°C (higher energy), PP runs 200–230°C. Evaluate chemical exposure, drop-impact frequency, and budget constraints before material lock-in.