Decision Context and Winning Criteria
Agriculture chair applications require materials balancing impact absorption, outdoor UV exposure, and manufacturing cost. PC dominates where transparency, high impact strength, and dimensional precision matter—typical wall thickness 1.5–4 mm with flexural modulus 2.3 GPa ensures structural rigidity under load. PP wins on chemical resistance to fertilizers and pesticides, plus lower resin cost (30–40% cheaper). Select PC when chairs require transparent elements, safety visibility, or premium aesthetics; choose PP when cost containment and chemical durability dominate procurement priorities. Melt temperature difference (PC: 280–320°C vs PP: 200–230°C) directly impacts tooling wear and cycle time economics.