Decision Context and Winning Criteria
PC logistics crates demand 280β320Β°C melt temperature processing with tight 0.5β0.7% shrinkage control to maintain dimensional stability in stacking applications. PP crates process at lower 220β260Β°C, reducing cycle time and energy costs. Choose PC when optical inspection, chemical resistance to fuels/oils, or high-impact drop testing (>2 m) drives design. Select PP when cost-per-unit, production volume >500k/year, and opaque walls suffice. PC's 2.3 GPa flexural modulus and 1.5β4 mm wall thickness enable thinner sections with superior stiffness; PP requires thicker walls (2β5 mm) for equivalent rigidity. Logistics buyers prioritize PC for reusable, transparent crates tracking contents; PP for disposable, cost-sensitive palletized loads.