Decision Context and Winning Criteria
PC vs PP selection for retail crate molds hinges on three procurement dimensions: optical transparency, dimensional stability, and total cost of ownership. PC's 280–320°C melt-temperature window and 0.5–0.7% shrinkage deliver superior dimensional precision—critical for stacked outdoor crates requiring tight tolerances. PP's 1.8–2.5% shrinkage demands post-mold compensation but reduces material cost 25–35%. PC's 2.3 GPa flexural modulus provides structural rigidity without reinforcement; PP requires glass-fill or thicker walls. Choose PC when transparency, impact resistance, and long-term UV stability justify premium pricing. Choose PP when volume economics and flow-ease override optical requirements and dimensional tolerance budgets allow ±1.5% variation.