Decision Context and Winning Criteria
PE excels in logistics applications requiring impact absorption and chemical resistance (excellent across solvents and oils). HDPE dominates when chair frames demand structural rigidity and dimensional stability under load. PE's flexural modulus (0.6–1.4 GPa) suits flexible seat backs and armrests; HDPE's superior stiffness supports load-bearing bases. Cost favors PE by 8–12% per kg, but HDPE reduces wall thickness requirements (2–3 mm vs PE's 2–5 mm), offsetting material premiums. Choose PE for seating components absorbing impact; select HDPE when chair structure requires non-deflecting frames under sustained logistics handling stress.