Decision Context and Winning Criteria
Choose PE when impact resistance and chemical durability outweigh stiffness requirements—typical for outdoor crates exposed to UV, solvents, or rough handling. PE's 0.6–1.4 GPa flexural modulus suits flexible-wall designs (2–5 mm). Select HDPE when rigid sidewalls, dimensional stability, and faster cycles are non-negotiable. HDPE's lower shrinkage (1.5–2.5%) reduces post-mold warping; PE's 2.0–3.0% shrinkage demands tighter cooling control. For retail crates stacked outdoors, HDPE wins if load-bearing rigidity is critical; PE wins if impact absorption and chemical resistance justify thicker walls or post-mold stress relief.