Decision Context and Winning Criteria
Choose PE for logistics crates when chemical resistance, impact absorption, and cost efficiency dominate. PE's flexural modulus of 0.6–1.4 GPa and density of 0.94–0.97 g/cm³ enable thinner walls (2–5 mm typical) and superior resistance to oils, solvents, and cleaning agents—critical for food and chemical distribution. Select PC when optical clarity, higher stiffness, and temperature stability (up to 120°C continuous) justify 15–25% cost premiums. PE's low stiffness weakness becomes critical only when crates require structural rigidity under stacking loads exceeding 500 kg. For reusable logistics systems with frequent thermal cycling and chemical exposure, PE molds outperform PC economically. PC wins in pharmaceutical or high-visibility tracking applications requiring transparency and dimensional stability across 50+ wash cycles.