Decision Context and Winning Criteria
PE (melt temp 180–230°C, shrinkage 2.0–3.0%) and PP (melt temp 220–280°C, shrinkage 1.8–2.5%) serve distinct agricultural crate requirements. PE's flexural modulus (0.6–1.4 GPa) prioritizes impact absorption and chemical resistance—critical for fertilizer, pesticide, and soil contact. PP's superior stiffness (1.5–2.0 GPa) and lower density reduce wall thickness (2–3 mm vs PE's 2–5 mm) and material cost. Choose PE when crates require flexibility, outdoor UV resistance, and aggressive chemical exposure. Select PP when structural rigidity, lightweight design, and cost per unit dominate procurement criteria. Wall thickness tolerance, gate location, and cooling time directly impact tooling cost and cycle efficiency—PE requires longer cooling cycles due to lower thermal conductivity.