Decision Context and Winning Criteria
Choose PP when outdoor baskets require high stiffness and dimensional stability under load. PP's flexural modulus (1.1–1.6 GPa) and low shrinkage (1.5–2.0%) ensure uniform wall thickness (1.5–4 mm) and consistent basket geometry across production runs. PP excels in chemical resistance to acids and bases, critical for retail environments with cleaning agents. Choose PE when impact resistance and cost efficiency dominate. PE's lower density (0.86–0.96 g/cm³ vs PP's 0.90 g/cm³) and superior toughness reduce mold stress and tooling investment. PE's waxy surface finish requires less post-processing. Decide based on: stiffness requirement, outdoor UV exposure duration, load-bearing capacity, and total cost of ownership including mold amortization.