System Boundary and Scope Definition
ABS basket tooling scope encompasses cavity design for 1.5–3 mm wall thickness, runner system proportioning to minimize regrind feed ratio, and thermal management within ABS's 220–260°C melt window. Define material density baseline (1.03–1.06 g/cm³) and shrinkage compensation targets (0.4–0.7%) at design phase. Retail applications demand tight dimensional tolerance capability—ABS's flexural modulus (2.1–2.8 GPa) supports structural integrity without over-specification. Establish cross-functional boundaries: tooling engineer owns cavity geometry and cooling circuit; material supplier certifies resin lot traceability; production owns process window maintenance and regrind equilibrium management. Scope excludes secondary operations unless specified in retail customer requirements.