System Boundary and Scope Definition
ABS chair-mold material selection encompasses resin grade qualification (virgin vs. regrind blend ratios), mold cavity design to ABS shrinkage bands (0.4–0.7%), and thermal-management logistics. Define scope boundaries: material supplier governs resin composition and melt-flow index; mold builder sets cavity geometry and cooling-channel layout for ABS's 220–260°C processing window; production scheduler manages cycle time and part-release timing. Exclude post-mold secondary operations (painting, assembly) unless they trigger regrind contamination protocols. Establish material-change approval gates: any virgin-to-regrind ratio shift above 20% requires dimensional re-certification and cooling-time adjustment. Document baseline: ABS density 1.03–1.06 g/cm³, flexural modulus 2.1–2.8 GPa, wall thickness 1.5–3 mm nominal.