System Boundary and Scope Definition
ABS crate tooling scope encompasses cavity design, runner geometry, and gate placement optimized for 0.4–0.7% shrinkage and 1.5–3 mm wall consistency. Mold thermal management must maintain melt temperature within 220–260°C window to prevent surface defects and dimensional drift. Retail crates demand stacking load performance tied to flexural modulus (2.1–2.8 GPa), requiring gate location strategy that avoids weld lines in stress-bearing ribs. Scope includes core/cavity steel selection, cooling circuit layout, and ejection pin placement to prevent warping. Supplier responsibility boundaries must clarify mold maintenance intervals, cavity repair authority, and material traceability documentation. Cross-functional handoff points: design engineering validates shrinkage factors; procurement specifies ABS resin grade and flow characteristics; production schedules cooling time and cycle targets.