System Boundary and Scope Definition
HDPE chair-mold lifecycle spans raw-material procurement through end-of-life recovery, encompassing cavity design, process-window validation, production scheduling, and reverse-logistics coordination. HDPE's linear polyethylene structure yields consistent 2.0β3.0% volumetric shrinkage, enabling predictable cavity compensation in mold design. System boundaries include: (1) mold cavity geometry locked at design-freeze; (2) injection-pressure and hold-time windows (180β230Β°C melt, 2β5 mm wall thickness); (3) warehouse stacking density (0.94β0.97 g/cmΒ³ material density reduces footprint vs. HIPS); (4) logistics cost per unit based on pallet weight and cube utilization. Exclude post-molding secondary operations and customer-site assembly from core mold-lifecycle scope; flag these as external touchpoints requiring separate SLA negotiation.