System Boundary and Scope Definition
HDPE chair-mold selection spans material qualification, tooling design, and process validation. Define scope boundaries: HDPE density (0.94–0.97 g/cm³) and flexural modulus (0.8–1.5 GPa) constrain wall thickness (2–5 mm nominal) and ribbing geometry. Mold cavity pressure profiles depend on melt viscosity at 180–230°C; exceeding this window risks degradation and brittleness. Retail durability demands low-temperature impact resistance—HDPE's advantage over PP. Establish cross-functional handoff points: material supplier certifies melt-flow index (MFI) and molecular-weight distribution; mold designer confirms gate sizing and cooling-channel placement; process engineer validates hold pressure and pack-hold timing to achieve 2.0–3.0% shrinkage compensation. Exclude secondary operations (painting, UV stabilization) unless integrated into material specification.