System Boundary and Scope Definition
PC basket molds for logistics applications operate within 280–320°C melt-temperature range, with cavity pressure peaks of 80–120 MPa during fill. Scope encompasses mold-design geometry (wall thickness 1.5–4 mm), cooling-circuit placement to manage PC's moderate thermal conductivity, and shrinkage prediction (0.5–0.7%) across the cavity. Logistics baskets require optical clarity for content visibility and impact resistance; PC's 2.3 GPa flexural modulus supports stacking loads. Material-specific constraints include poor solvent resistance—critical if baskets contact cleaning agents or fuels—and thermal-stress sensitivity during ejection. Supplier coordination must verify mold steel grade, cooling-water flow rates, and demold-angle requirements before tooling fabrication.