System Boundary and Scope Definition
PC chair-mold trial validation encompasses mold filling dynamics (melt temperature 280–320°C, cavity pressure monitoring), dimensional stability (0.5–0.7% shrinkage compensation), and demold behavior across 1.5–4 mm wall sections. Scope includes pre-heating protocols, injection-speed optimization to prevent jetting and weld-line formation in armrest and backrest ribs, and mold-temperature control (typically 80–110°C for PC) to maintain optical clarity. Logistics trial scope covers sample pull sequencing, in-process SPC data capture, and material traceability from resin lot through first-article inspection. Cross-functional handoffs link injection-molding parameters to logistics staging, warehouse climate control (PC sensitivity to humidity absorption), and distribution validation. Exclusions: post-molding secondary operations and end-use performance testing beyond dimensional/visual acceptance.