System Boundary and Scope Definition
PE chair-mold lifecycle cost encompasses material procurement, tooling design, injection parameters, post-mold finishing, and assembly integration. Scope includes PE resin selection (0.94–0.97 g/cm³ density), mold cavity layout for 2–5 mm walls, gating strategy to manage 2.0–3.0% shrinkage, and cross-functional handoffs between design engineering, mold supplier, resin vendor, and production. Cost drivers include mold steel grade, cooling-system complexity, and secondary operations (trimming, surface treatment). PE's low stiffness versus PP requires structural ribs or wall thickness increases, extending cycle time and material cost. Boundary excludes finished-goods logistics but includes in-plant material handling and first-article inspection.